español

About Art

Community

Goals

Contact


Liberty Ranch

our

New High School

Over Budget

Blueprints

Kitchen Plan

Welcome to Galtsnewhighschool.com, official web site for Art Oelsner, Galt High Board Member, elected November 2006. The entire content of this site should be considered my own personal political opinions.

Pushing the agenda

Honesty, Integrity, Transparency

A Cultural Shift

November 22, 2008 | By: Art Oelsner

GALT, Ca. (November 22) - 2 years on our Galt High Board. My sincerest apologies for not keeping up this page. Hope to give the community a clear picture of my experiences the last several months.

I campaigned to get elected to our local school board for 1 reason. To serve the community. I have no other hidden agenda. I have a child attending Galt High, and another that graduated and currently attends Chico State.

Our district is like many others in California. Plenty of terrific teachers, administrators, and staff. Award winning programs, and talented students.

Sometimes our district falters, sometimes we make mistakes. My goal is not to demand perfection, but instead to see a change in the way the district address's concerns from the community. I want to see a Cultural Shift in the Galt High School District. A shift towards more Honesty, Integrity, and Transparency.

Lease/lease back option being pursued

March 20, 2007 | By: Art Oelsner

GALT, Ca. (March 20) - A special board meeting was held to discuss the lease/lease back option for the construction of the new high school along with presentation by representatives of F & H Construction.

The "Lease" in Lease Back

The term "lease" creates a bit of confusion with this issue. The fact is that the district takes ownership back from the construction company a short time after construction is completed.

The history of Lease/lease back with Galt High

Although proposed in the past, the process has finally moved forward with the support of our new board and in particular the leadership of our Board President Norm Pearson. The Oakview School District has completed previous projects with the use of the Lease/lease back method and F & H construction, and is VERY happy. Thanks to Norm Pearson and the president of the Oak View Board for their input on Lease/ lease back.

Cost Savings

Traditionally bid construction projects allow for only a single bid from on each area of the project. Lease/lease back will allow the bidder to bid the original items but also supply a Value Added bid on the item. Value Added bids are the bidders modified price based on different specifications, materials, or construction methods. This method allows each bidder to supply 2 separate bids on the same item, and present both to the district for approval. Significant cost savings can be had using this method.

The Bottom Line "Maximum Guaranteed Price"

The construction company will supply the district with a Maximum Guaranteed Price for the construction of the new high school. The bids will be available in mid April and we are hopeful the price of this project will be within our budget. (See Below)

Back to Top


Insurance slashed, Blackberry's saved!

March 12, 2007 | By: Art Oelsner

GALT, Ca. (March 12) - Another Galt High board meeting, another late night. Interesting start as a member of the audience came to lecture the board about not bring egos into the meeting. Too bad this particular gentleman hadn't been to any of the previous meetings to observe that we really are a much tamer bunch than he wanted to imply.

Key issues addressed:

The "Blackberry Initiative"

The board voted unanimously to "discourage" the use of electronic communication devices during open session. Unfortunately this became an issue, for the first time ever, because I apparently gave the perception to another board member that I was "text messaging" someone in the audience during my first board meeting. I confess, I was. The message was from my wife, in the front row, it read, "Sit up straight." Guilty as I am, I am sad that it took the time and resources of the board to address this issue. It is really about TRUST between board members, and not about technology. Interesting that Mr. Maple has been using his cell phone the last couple of meetings.

The Insurance Issue:

We voted on Health Insurance for board members. The vote was 3-2 in favor of an $800 cap on benefits for board members. The old program allowed board members to take as much as $1600. from the district. We now have a cap that is within $10.00 of what an employee with a 4 member family would pay for health insurance at Galt High School. Pat made a motion to eliminate the benefit altogether. That should serve him well in the next election.

Crime on Campus

Vice Principal, Joe Saramago, presented an excellent response to the issues concerning crime on campus mentioned at a previous meeting. Very proactive and specific in addressing the individual concerns expressed.

Short term goals:

  • Lines will be painted on the concrete outside restrooms stating "no loitering".
  • Campus security personnel have been briefed about the importance of monitoring restrooms and questioning anyone that does not belong on school grounds.
  • Teachers have been encouraged to use proper passes for restroom use, and report excessive bathroom breaks or suspicious behavior.
  • Campus security will attend training in April that will cover the roles and responsibilities of school security, laws and liability, security awareness in the educational environment, mediation and conflict resolution, disasters and emergencies, and the dynamics of student behavior.

Long Term Goals:

  • Work with local police on using an undercover officer to help uncover illegal activity.
  • Hire a full time Resourse Officer to increase the number of campus security personnel.
  • Create a parent volunteer group to monitor activity on and around campus.
  • Implement the use of drug dogs on campus.
  • Increase the number of security cameras on campus.
  • Put a fence around the campus.

The Change Order Process

Contrary to Mr. "let's keep doing business from the front porch of the general store" objection, we now have an excellent change order procedure. It's not about "rubber stamping" everything that comes in front of us Pat, it's about doing business in a professional manner. With the help of Darlene Waddle and our district's construction manager, Trevor, a policy has been developed that is clear, concise, and brings the whole process up to a business standard we can be proud of.

Back to Top


Liberty Ranch High School

Over Budget by $20,000,000 (Million)

(I was a member of the Liberty Ranch Independent Oversight Committee)

  • Liberty Ranch High School, is currently designed for $71,000,000
  • $10,000,000 over budget, we only have $60,000,000, based on figures calculated from March 2005.
  • Current estimates prepared by our district office indicate before construction begins will be closer to $20,000,000 over budget.
  • Plans were drawn before we passed a $60,000,000 bond.
  • The Independent Oversight Committee is now charged with oversight of design and construction of a High School that is $20,000,000 over budget before construction begins.


Back to Top

Liberty Ranch High School

$6,000,000 (Million) on Blueprints?

  • Our School Board in 2005 spent $5,000,000 million on blueprints.

  • Current estimates on the blueprints, prepared by our district office indicate the cost of the Bluepints will now be $6,000,000 million. (That's right, it's now $1,000,000 million more to draw the plans. When asked why at the last Independent Oversight Committee meeting there was no explanation.

Back to Top

Liberty Ranch High School

The New Cafeteria - A plan overdone?

The new Liberty Ranch High school cafeteria, as drawn by the architect is without a doubt the finest food service facility in the area, featuring 6 different "restaurant" themes. Our children will be able to select from dozens of different entrées each day. Click here for a PDF version.

  • Over 1/3 of the space dedicated to Pizza Service?

  • Approx. $4,000,000 for a school cafeteria?

  • Could the kids survive with less choices?

    • Over $6,000,000 was allocated for the building that houses the Cafeteria. The Independent Oversight Committee has asked repeatedly over the last few months, for pricing on the specified equipment. The district/architect simply refuses to comply with the request.

Back to Top


Questions? Give me a call.

Art Oelsner 209-670-5477

E-mail

beechcraft@softcom.net

Welcome to Galtsnewhighschool.com - The entire content of this site should be considered my own personal political opinions. Paid for by Art Oelsner


Back to Top

© 2004 Art Oelsner Web Design